SELECTION & PROCUREMENT
Aruba network BOM template: APs, CX switches, gateways and subscriptions
Prepared by Xunhui Information · English publication: 2026-11-10
Prepare an actionable configuration request covering equipment, power, installation, interconnects, software and service boundaries.
A BOM defines the complete procurement scope
A bill of materials should explain what is needed, how many units are required, why each item is needed and whether it is included. It is not a fixed package of model numbers. Use this template to organize a request; unknown quantities remain subject to design and compatibility checks.
Record the site and business requirements
- Destination country, installation environment, floor plans, mounting locations and materials.
- Concurrent clients, business applications, visitor access and IoT devices.
- Existing equipment, software, management platform, cabling, racks and power.
- Expansion or replacement scope, migration phases, delivery expectations and acceptance requirements.
Equipment and component schedule
For every line, enter the complete SKU, quantity, parent device and one of: included, separately ordered, not required or awaiting confirmation.
| Line | Record | Verify |
|---|---|---|
| Access points | Model, regional SKU, quantity and location | Coverage, capacity, clients and software |
| AP power | PoE or DC supply and quantities | Operating mode, port and total budgets |
| Mounts and antennas | Brackets, fixings, antennas and cables | Exact model and mounting surface |
| CX switches | Part number, ports and quantity | Access speeds, PoE and available uplinks |
| Power and cooling | Included and additional modules | Redundancy and consistent airflow |
| Interconnects | Optics, DAC/AOC, fiber and distance | Both link ends and occupied ports |
| Gateways/controllers | Role, capacity and quantity | Whether the architecture requires them |
| Management/licenses | Platform, tier, features and term | Account ownership and supported devices |
| Identity and access | Authentication and required licenses | Employee, guest and IoT integration |
| Support and implementation | Scope, term, configuration and tests | Vendor versus implementation responsibilities |
Adjust for the environment
Offices and campuses
Separate work areas, meeting rooms and busy shared spaces. Record conferencing demand, guest access and floor interconnects. Check existing management and switching capacity before expansion.
Hospitality
Separate guest rooms, corridors, lobbies, meeting spaces and outdoor zones. Record wall cabling, wired room devices, guest authentication and operational-network separation. Do not assume one fixed AP count per room or reuse ceiling-AP installation assumptions for wall-plate units.
Industrial sites and branches
Record rack heights, changing stock layouts, mobile-client routes, environmental conditions and maintenance windows. For branches, add WAN connectivity, application access, tunnels and management requirements.
Three cross-checks before ordering
- Device to device: power, optics, connectors, stack members and cables.
- Hardware to software: versions, management platform, licenses and required features.
- Configuration to site: mounting, racks, cabling, power and acceptance conditions.
Copy this request outline
Destination country and project environment: New installation, expansion or replacement: Candidate model / complete SKU / quantity: Existing equipment / software / management: Client scale / applications / site conditions: Power, mounts, optics, subscriptions: included / additional / confirm Delivery expectations and acceptance requirements: Questions to resolve:
Do not include device passwords or account credentials. Send your configuration requirements. Quotes are requested in USD; availability, shipping, taxes and order terms are confirmed for your destination.
Apply the guidance to your project
Share the model, quantity, destination and existing network so we can discuss the complete configuration.
Discuss configuration & quotation ↗